Embodied energy: Difference between revisions

From Auroville Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 7: Line 7:
{|
{|
|-
|-
| '''BUILDING MATERIAL'''
| '''BUILDING MATERIAL'''  
| '''EMISSIONS (KG CO2 /m3)'''
| '''EMISSIONS (KG CO2 /m3)'''
|-
|-
| Country Fired Brick
| Country Fired Brick  
| 333
| 333  
| +++++++++++++
| +++++++++++++
|-
|-
| Wire Cut Fired Brick
| Wire Cut Fired Brick  
| 290
| 290  
| +++++++++++
| +++++++++++
|-
|-
| Hollow Concrete Block
| Hollow Concrete Block  
| 132
| 132  
| +++++
| +++++
|-
|-
| Solid Concrete Block
| Solid Concrete Block  
| 113
| 113  
| ++++
| ++++
|-
|-
| Modular Brick
| Modular Brick  
| 110
| 110  
| ++++
| ++++
|-
|-
| 5% CSEB(240), soil from 20 kms off site
| 5% CSEB(240), soil from 20 kms off site  
| 102
| 102  
| ++++
| ++++
|-
|-
| 5% CSEB(240), Production on site
| 5% CSEB(240), Production on site  
| 100
| 100  
| ++++
| ++++
|-
|-
| Aereated Block
| Aereated Block  
| 70
| 70  
| ++
| ++
|-
|-
| Sandlime Brick
| Sandlime Brick  
| 68
| 68  
| ++
| ++
|-
|-
| Clay Fly ash Brick
| Clay Fly ash Brick  
| 56
| 56  
| ++
| ++
|-
|-
| Fal-G Block
| Fal-G Block  
| 36
| 36  
| +
| +
|}
|}
Line 60: Line 60:


[http://en.wikipedia.org/wiki/Embodied_energy Embodied energy on wikipedia]
[http://en.wikipedia.org/wiki/Embodied_energy Embodied energy on wikipedia]
[[Category:Energy]]
[[Category:Architecture]]

Revision as of 06:51, 5 May 2009

Embodied energy is defined as the available energy that was used in the work of making a product. Embodied energy is an accounting methodology which aims to find the sum total of the energy necessary for an entire product lifecycle. This lifecycle includes raw material extraction, transport, manufacture, assembly, installation, disassembly, deconstruction and/or decomposition.

Embodied energy of building materials


BUILDING MATERIAL EMISSIONS (KG CO2 /m3)
Country Fired Brick 333 +++++++++++++
Wire Cut Fired Brick 290 +++++++++++
Hollow Concrete Block 132 +++++
Solid Concrete Block 113 ++++
Modular Brick 110 ++++
5% CSEB(240), soil from 20 kms off site 102 ++++
5% CSEB(240), Production on site 100 ++++
Aereated Block 70 ++
Sandlime Brick 68 ++
Clay Fly ash Brick 56 ++
Fal-G Block 36 +


External links

Embodied energy on wikipedia