News & Notes 602:TDC-L'avenir d'Auroville 20th June 2015
Entity::TDC- L'avenir d'Auroville 20th June 2015
The following Site and Building applications are announced for feedback from the community for a period of two weeks. The announcement is made for feed-back only and does not mean that the project has final approval. The final approval is given when L'Avenir / TDC issues an NOC (No Objection Certificate). This happens only once the feed-back period is over, the feedback has been evaluated, final decision by TDC has been reached and the necessary financial formalities have been completed. It is only after issuing a final building permission that fencing, building or any other activity on the site can start. It has to be noted that site permission is given to reserve the site for a maximum period of two years in order to prepare a project proposal. It does not give any right to fence and clear the site unless, for practical reasons, there is a special permission of TDC.
Individual Projects
Building Permission:
- 1. Jan, Gaia, Change of Roof (keet to Metal)
Site permission:
- 1. Site for Selvam G., Granite usage on plot no. IR 213/2 for an area of 3.02 acres
Collective Projects
Site Permission
1. The Neem Tree - Min, Partha (Maitreye), Representative of the Road Service (Alain G)
- Project write-up given by the project holder:
- Project Title: The Neem Tree
- Proposed Site Location: In Mahalaxmi Park-Behind Auroville Library
- Project Holder: Min, Partha (Maitreye), Representative of the Road Service (Alain G)
- Architect: Sonali
- Contact Persons: Min and Partha
- Description: This project is conceived to bring Aurovilians and guests, young and old, together around food and holistic, healing and sustainable activities.
2. Earth Weavers - Meera Prajapathi, Material & Structural Research Architectural & Design
- Project write-up given by the project holder:
- Project Title: “Earthweavers” Environmental Design - Architecture, Design and Development, Material and Structural Research.
- Proposed Site Location: Pony farm – allotted by Lávenir
- Project Holder: Meera Prajapati
- Architect: Meera Prajapati
- Contact Persons: Meera Prajapati
- Description: “Earthweavers” is involved in Architecture, Design and Development, Material and Structural research. Earthweavers activities are also foreseen as an Avenue for many Aurovillians to be part of these Material and Structural Researches, Design and Development, from general to specific.
- Target Group: Designers Researchers and End users
- Background: We have done several works in this line already. While Architecture, Design and Development goes on for us, Material and Structural Research are much more demanding and Dynamic activity that we are into. While in Auroville we have many Design Offices, we don't have any Material and Structural Research place to have hands on along with Design and Development. Earthweavers is working in this direction.
TDC asks for feedback from the residents of Auroville within two weeks from the date of publication. If anyone wishes to have detailed information, feel free to contact TDC - L’avenir d’Auroville office: 262-3568 or come personally to the Building Application section.'
Road for feedback: Ring Road and Verite Radial
The TDC asks for community feed-back for the construction of the Ring Road (Mangalaksmi stretch) and the Verite Radial from the Ring Road to Eco Service. In the Town Hall detailed maps of both stretches are available including all local details. (see map on Auronet)
~ L'avenir